Sales refusals

Every message Sales gives when it refuses a quotation, order, delivery, packing, dispatch or return step, what it means and what to do.

View as Markdown

When the system refuses a step it shows the message in red and changes nothing. Find the message below. {placeholders} stand for the real number, name or value.

Some refusals are the same everywhere in Factory OS: signature authority, a missing reason, access letters, signed-record locks and the training gate. They are explained once in Signatures and refusals.

Quotations

For Quote and confirm a sales order.

Editing a quotation

MessageWhenWhat it meansWhat to do
{pn} is a development item ({stage}) and is not qualified for production.Saving a quotation or order for a part number that is still a development item.Engineering has not qualified it.Wait for the item to reach Qualified, or choose another product.
Add at least one product line with a product and quantity.Saving a document with no product line, or a line without a product.Every document needs a priced line.Add a product and quantity.
Line {n}: quantity must be above zero.Saving a line with quantity 0 or empty.Quantities start at 1.Enter a quantity.
Line {n}: quantity must be a whole number.A fraction in quantity.Pieces are whole.Enter a whole number.
Line {n}: quantity cannot be above 100,000,000.A quantity above the limit.Probably a typing error.Correct it.
Line {n}: unit price cannot be negative.A negative price.Prices start at zero.Correct it.
Line {n}: unit price is too large.A price above 999,999,999,999.99.Typing error.Correct it.
Line {n}: discount must be between 0 and 100%.A discount outside 0 to 100.Discount is a percentage.Correct it.
Line {n}: tax must be between 0 and 100%.A tax rate outside 0 to 100.Tax is a percentage.Correct it.
Line {n}: the line total is too large.Quantity times price above the limit.Typing error.Correct quantity or price.
Unit price cannot be negative.A negative Unit price on the quotation.Prices start at zero.Correct it.
Unit price is too large.Unit price above the limit.Typing error.Correct it.
Valid until ({valid}) is before the created date ({created}).A validity date before the created date.A quotation cannot expire before it starts.Move Valid until later.
Only draft {quotations or sales orders} can be editedEditing a quotation or order that has left Draft.Documents are fixed once sent or confirmed.Use Reset to draft on a quotation, or Amend order on a confirmed order.

Send to customer

MessageWhenWhat it meansWhat to do
Set the order risk on {key} before sending (ISO 9001 6.1, ISO 13485 7.1).Pressing Send to customer or Send again with no Order risk.The risk is part of the offer.Choose the Order risk.
{risk}: record the risk actions (e.g. extra review, longer lead time, FAI) before continuing.Sending or confirming a quotation whose risk is not Standard and Risk actions is empty.Risky orders need a recorded response.Write the Risk actions.
{key} was valid until {date}. Extend the validity date before sending it.Sending a quotation past its Valid until date.An out-of-date offer must not go out.Reset to draft, set a later date, send again.
{pn} cannot be quoted: {reason}. {detail}Sending a quotation with a product that is obsolete, not released, unpublished, or not set up. The reason is the product's sell state, for example obsolete, not released, unpublished or not set up.The product cannot be supplied.Remove the line, or fix the product in Engineering or the catalogue.
Review the message first: use Copy to clipboard or Send by email.The send dialog was submitted without a message.The app records what was sent.Open the dialog again and choose one of the two buttons.
Enter a valid customer email address.Send by email with an invalid address.The address is not an email.Correct Customer email.
Enter a valid customer email address, for example name@company.com.Saving a customer whose Email is not valid. Several addresses may be separated by commas or semicolons.Not an email.Correct it.

Confirm, reset and cancel

MessageWhenWhat it meansWhat to do
Set the order risk on {key} before confirming (ISO 9001 6.1, ISO 13485 7.1).Confirm with no Order risk.See above.Choose it.
{key} is {in production or shipped}.Reset to draft on an order that is in production or shipped.The order is under way.Leave it.
{key} has {mo}. Cancel the manufacturing order firstReset to draft while a manufacturing order exists.Production is linked.Cancel the manufacturing order.
{key} has {do}. Cancel the delivery order firstReset to draft while a delivery order exists.A delivery is linked.Cancel the delivery order.
{key} was amended (rev {n}). Sign the re-review before changing status.Any step on an amended order whose review is not signed again.An amendment reopened the contract review.Answer the review items and choose Sign review.

Sales orders

For Quote and confirm a sales order.

Contract review and amendment

MessageWhenWhat it meansWhat to do
The contract review is closed.Editing or signing a review that is signed, or that belongs to an order which is not Draft and not reopened by an amendment.The review is a signed record.Reopen review on a Draft order, or amend a confirmed one.
{id} is not a contract review item.A review answer for an unknown question.Normally only an old screen sends this.Reload the order.
Resolve items marked No before signingSign review with a No answer.A No means a requirement is not met.Solve the point, change the answer.
Answer all {n} items before signing.Sign review with open questions.All nine must be answered.Answer the rest.
Only the signed review of a draft order can be reopened.Reopen review on a review that is not signed, or an order that is not Draft.Confirmed orders are changed through Amend order.Use Amend order.
Only a confirmed order with a signed contract review can be amended.Amend order on any other order.Draft orders are edited directly.Edit the draft.
Enter a quantity above zero.Submit amendment with quantity 0 or empty.See above.Enter a quantity.
Enter the quantity in whole pieces.A fraction.Pieces are whole.Enter a whole number.
Enter the due date.No due date.Required.Enter it.
The due date {date} is in the past.A new due date before today.Dates move forward.Choose a future date.
Change the quantity or the due date.Both equal the current values.Nothing to amend.Change one.
Enter the reason for the change.Reason for change empty.Required.Type the reason.
Reduce the quantity on the order lines instead.An amendment that would take the first line to zero or below.The change goes to one line.Edit the lines on a draft, or use a smaller change.
{key} is {status}. Change its quantity or due date with Amend order, which signs a revision and reopens the contract review, or set it back to draft (ISO 13485 7.2.2).Editing a confirmed order's fields directly.Confirmed terms change only by amendment.Amend order, or Reset to draft.

Confirm

MessageWhenWhat it meansWhat to do
{channel} order: send the customer a written order confirmation and record its reference before confirming (ISO 13485 7.2.2).Confirm on a Phone or Verbal order with an empty Written confirmation sent.Spoken orders need a written follow-up.Send the confirmation and enter its reference.
Customer PO order: record the customer's PO number before confirming {key} (ISO 13485 7.2.2).Confirm on a Customer PO order with an empty Customer PO no..The PO is the contract.Enter the PO number.
PO {cpo} of {customer} is already on open order {key}. Use the right PO number, or amend {key} instead of ordering twice (ISO 13485 7.2.2).Confirm with a PO number used on another open order of the same customer.A double order.Correct the number, or amend the other order.
{pn} is in development ({item}, {stage}) and cannot be ordered for production until it is qualified.Confirm when a line names a product that a development item has not yet qualified.The product is still being developed.Wait for the QA manager to qualify the item, or remove the line.
Cannot confirm {key}: {reasons}. Release the product or remove the line (ISO 13485 7.2.2).Confirm when a product is not ready. Reasons are: {pn} is not in the product list, {pn} is {status} in Engineering, {pn} has no approved production method, {pn} has no machine option on {method}.Production cannot make it yet.Ask Engineering to finish the product, or remove the line.
Complete and sign the contract review before confirming {key}.Confirm without a signed review.See Do the contract review.Sign the review.

Cancel and reset

MessageWhenWhat it meansWhat to do
{key} has {mo} open ({status}). The order can be cancelled once the manufacturing order is completed.Cancel with an open manufacturing order.Material would keep being used.Complete the manufacturing order.
{key} has delivery order {do} open. {Cancel it, or Return it to draft and cancel it} before cancelling the order.Cancel with a Draft or Picked delivery order.The goods could still ship.Follow the sentence.
{key} has {mo}. Cancel the manufacturing order before setting the order back to draft.Reset to draft with a manufacturing order.Linked.Cancel the manufacturing order.

Plan production

For Plan production.

MessageWhenWhat it meansWhat to do
Every line on {key} already has a manufacturing order ({mos}).Plan production when each line has one.Nothing left to plan.Open the manufacturing order.
Cannot plan {pn}: {reason}. Release it in Engineering first.Plan production for a product that is not ready (reasons as in Confirm above).Not ready.Finish it in Engineering.
{key} is {shipped, closed short or cancelled}. A manufacturing order cannot be raised against it.Linking a manufacturing order to a finished sales order.No demand is left.Choose an open order.

Material requirements

MessageWhenWhat it meansWhat to do
{key} is {status}. No purchase requisition can be raised for it.Raise purchase requisition on a Shipped, Closed short or Cancelled order.Nothing to buy for.None.
{pr} is already raised for {item}.Raising a requisition that exists.One per item.Open that requisition.
{key} is not short of any material.Nothing to raise.Stock covers it.None.
{item} is not a material of {key}.An item that is not in the bill of materials.Wrong item.Reload the order.

Customers

MessageWhenWhat it meansWhat to do
A customer named {name} already exists ({code}). Use that customer, or give this one a different name.Adding or renaming to an existing name.Documents find a customer by name.Use the existing customer.
{name} is named on {documents}, so its name cannot change. Add the new name as a new customer and use it on new documents.Renaming a customer used on documents.Old documents would lose their customer.Add a new customer.

Delivery orders

For Pick, pack and ship.

Creating a delivery order

MessageWhenWhat it meansWhat to do
{key} is {closed short or cancelled}. No delivery order can be created.Create delivery order on a finished order.Nothing can ship.None.
{do} is still open for {key}. {Ship or cancel it, or Ship it, or return it to draft and cancel it,} first.Create delivery order while one is open.One at a time.Follow the sentence.
{key} is fully shippedNothing is left to deliver.Done.None.
{so} is closed. A delivery order cannot be made for an order that was cancelled or closed short.Saving a delivery order for a finished order.See above.Choose an open order.

Checks on every delivery step

These come from one rule that runs when you save a delivery order, build or load a pack, confirm a dispatch and ship. The refusal is also written to the delivery order's history as Delivery refused.

MessageWhenWhat it meansWhat to do
Sales order {so} does not exist. / {key} names no sales order.The delivery has no valid order.Broken link.Pick the right order.
{so} is cancelled. A delivery of a cancelled order cannot ship.Any delivery step on a cancelled order.Nothing ships.None.
{so} is {status}. Deliver against an order that is confirmed, in production or partially shipped.The order is Draft or another status.Not yet confirmed.Confirm the order first.
{so} was amended (rev {n}). Sign the re-review before delivering against it.The order has an unsigned re-review.Amendments reopen the review.Sign the review.
{key} is for {customer}, but {so} is for {customer}.Customers differ.Wrong order.Correct the customer.
{pn} is not on {so}.The product is not on the order.Wrong product.Correct it.
{key}: the quantity must be more than zero.Quantity 0.Enter a quantity.
{key} is for {qty} pcs of {pn}, but only {n} pcs of {so} are still open (ordered {a}, shipped {b}, on other open delivery orders {c}).Quantity above what is still owed.Over-delivering.Reduce the quantity.
{pn} is not in the product list, so no lot can be matched to it.The product has no catalogue name.Setup gap.Ask Engineering.
Lot {lots} does not exist in stock. Pick the lot from the released stock of {item}.A lot that is not in stock.Typing error.Choose a real lot.
Lot {lot} is {item}, not {item}. A delivery of {pn} can ship only lots of {item}.A lot of another item.Wrong lot.Choose a lot of the right item.
Not released: {lots}. Only released lots can ship.A lot is not Released (quarantine, on hold, or not found).QA must release it.Wait for release, or choose another lot.
Lot {lot} has only {n} pcs left{ ({m} pcs are already dispatched on other delivery orders)}; {k} pcs are on {key}.A lot holds less than the delivery takes.Not enough stock.Choose other lots or reduce the quantity.
Packs and dispatches are recorded on the Packing screen.Editing the packing data by hand.Packing has its own screen.Use Packing & dispatch.
{key} has packs built. Its quantity and lots cannot change; cancel it and create a new delivery order.Changing quantity or lots after packs exist.Packs are labelled for those lots.Cancel and create a new one.

Mark as picked, return, cancel

MessageWhenWhat it meansWhat to do
{so} is closed. {do} cannot move on; it stays as the record.Moving a delivery of a finished order.See above.None.
{do} has a dispatch confirmed, so goods have left. Ship it, or return the dispatch (signed, with a reason) before cancelling it.Cancel after a dispatch.Goods left.Ship · issue CoC or Return dispatch.
{do} has a dispatch confirmed. Return the dispatch (signed, with a reason) before taking it back to draft.Return to draft after a dispatch.Return dispatch first.
{do} has a dispatch confirmed, so goods have left. It stays as the record.Deleting it.Not deletable.None.

Packing

MessageWhenWhat it meansWhat to do
{do} is {status}. Nothing is left to pack.Opening a delivery that shipped or was cancelled.Done.None.
{so} is {status}. {do} cannot be packed or dispatched.The order is closed.See above.None.
Lot {lots} is not released by QA. Packs cannot be built.Build and label next pack with unreleased lots.Waiting for QA release.Wait.
Every open piece is already packed.Building one pack too many.Complete.Load and dispatch.
The delivery order has no lots to pack from.No lots on the delivery.Needs lots.Edit the lots.
The lots on {do} hold only {n} pcs, fewer than its {m} pcs. Correct the lots before building more packs.Lots cover less than the quantity.Short.Add lots.
{pack} is not an open pack of {do}.Scan load on a pack that is not open.Wrong pack.Scan an open pack.
Scan or type the ID of {pack} to load it.Scan load with the Pack ID field empty.Nothing was scanned.Scan the label or type the ID.
{scanned} is not {pack}. Scan the label of the pack that you load.Scan load with another pack's ID.A wrong carton.Scan the label of the pack in front of you.
Lot {lots} is released but still in Q-FG-01. The store puts it away first: post its put-away in Stock movements.Build and label next pack from a released lot still in the outgoing-QC bin.The store has not confirmed the move into finished goods.The store keeper posts the put-away.

Dispatch

MessageWhenWhat it meansWhat to do
Packs of {do} are from {lots}, beyond the lots on the delivery order. / Packs of {do} left from {lots}, beyond the lots on the delivery order.Confirm dispatch or Ship with packs from other lots.The lots shipped must be the lots sent.Return dispatch and correct.
Complete the dispatch checks firstConfirm dispatch while a check fails.See the five checks.Fix the failing check.
You packed {do}, so someone other than the packer confirms its dispatch. Ask another authorised colleague to sign it.Confirm dispatch by the person who built its packs.The dispatch is checked by a second person (7.5.8).Ask another colleague with delivery write access to sign.
Pack, load and confirm the dispatch of {do} on the Packing screen before shipping.Ship · issue CoC with nothing dispatched.Packing first.Dispatch.
{do} dispatched {n} pcs, more than its {m} pcs. Correct the delivery order before shipping.More dispatched than ordered.Mismatch.Correct the quantity.
{do} has no confirmed dispatch to return.Return dispatch with none.Nothing to reverse.None.

Ship

MessageWhenWhat it meansWhat to do
{so} was closed short. A delivery of a closed order cannot ship.Ship · issue CoC on a closed order.Finished.None.
Lots shipped must cover {n} pcs before shippingThe lots add up to less than the quantity.Short.Add lots.
Not released: {lots}. Only released lots can ship.A lot changed to On hold since.Ask QA.
Lot {lot} has only {n} pcs left; {m} pcs are on this delivery order.Another shipment took the pieces.Return dispatch, correct, repack.

Certificate of conformance

For Print the certificate of conformance.

MessageWhenWhat it meansWhat to do
No certificate yet: ship {do} first; shipping issues its certificate of conformance.Opening the certificate of a delivery order that has not shipped.The certificate is issued by Ship · issue CoC.Ship the delivery order, then open the certificate.

Close short and balance

For Ship part of an order or close it short.

MessageWhenWhat it meansWhat to do
{so} has {mo} open ({status}). The balance can be closed short once the manufacturing order is completed or cancelled.Close short with a manufacturing order open.Production would keep running.Complete or cancel it.
{so} has delivery order {do} open. {Ship or cancel it, or Ship it, or return it to draft and cancel it,} before closing the balance short.Close short with an open delivery.Goods could still ship.Follow the sentence.
{so} has no balance left to close. It is fully shipped.Close short on a fully shipped order.Nothing to close.None.
Close short needs a reason. Enter why.Close short without a reason of 4 characters or more.A reason is kept with the signature.Type it.

Returns

For Returns (RMA).

MessageWhenWhat it meansWhat to do
Select the quarantine locationReceive into quarantine with no Quarantine location.Returned goods go on hold in a bin.Choose a location.
Record the inspection result and the dispositionRecord inspection with an empty result or disposition.Both needed.Fill them.
A fault was found: link the NCRRecord inspection with a fault disposition and no NCR.A fault needs an NCR.Link one, or Return as is (no fault found).

Signing authority for these steps: Authorise return, Refuse and Close · disposition done need a QA engineer. Receive into quarantine needs a store keeper. Record inspection needs a QC inspector. Return dispatch needs a QA manager. A refusal for the wrong signer is explained in Signatures and refusals.

Next steps

Quote and confirm a sales orderBack to the first task.